Blackwood Wind Farm

Blackwood Wind Farm Ltd is proposing a five-turbine wind farm development with a total generating capacity of around 24 megawatts (MW) and a battery storage facility with a capacity of up to 100MW.

The site is located approximately 2km east of New Cumnock.

The proposed Blackwood Wind Farm development will have a combined installed capacity of around 124MW and deliver long-term environmental, economic and social benefits for the local community.

This includes helping to address climate change, enhancing energy security, lowering energy bills, and delivering meaningful local economic benefits, including the establishment of a Community Benefit Fund.

Blackwood Wind Farm Ltd is a subsidiary of independent renewable energy developer Qair Scotland Ltd.

Key benefits of development*:

  • Power the equivalent of around 13,600 Scottish homes annually with clean energy.
  • Remove around 18,700 tonnes of carbon dioxide emissions from the atmosphere annually, assisting in tackling the climate emergency.
  • Deliver greater energy security and lower energy bills for consumers.
  • Maximise renewable energy supplied to the electricity grid through a battery storage facility, further contributing to greater energy security.
  • Provide a Community Benefit Fund of around £120,000 annually (index-linked), with a Memorandum of Understanding signed with New Cumnock Development Trust.
  • Deliver a habitat management plan to increase nature biodiversity on the site itself.
  • Generate local employment opportunities and deliver business rates for East Ayrshire Council.

*Based on current proposals

Site Location

The site for Blackwood Wind Farm comprises two separate parcels of grassland, predominantly used for grazing cattle and sheep. Total site area is approximately 313 hectares, as indicated by the red line boundaries.

The site to the west, between Redree Burn and Burnt Hill, covers approximately 69 hectares. To the east, the site between Burnton, Waistland and the Garepool Burn covers approximately 243 hectares.

There is a small non-native conifer plantation on site, as well as a patch of native deciduous woodland along the banks of the Elder Burn.

Site Location

Site location plan

Development Proposals

Blackwood Wind Farm is proposed to comprise:

  • Five turbines with a total generating capacity of around 24MW and a height to the blade tip of up to 149.9 metres. This is a reduction from the seven turbines of up to 180 metres displayed at the first public consultation event, with the two turbines nearest the town dropped, and follows public feedback and other studies and technical assessments.
  • Battery storage facility with a capacity of up to 100MW. This will store excess renewable energy during periods of low demand and/or peak generation. Energy will then be released into the electricity grid when required, improving local grid stability and reducing the risk of blackouts.
  • Ancillary infrastructure including access tracks, underground cabling, inverters, transformers, storage containers, substations, temporary construction compound, borrow pits, security fencing and CCTV.
  • A habitat management plan to deliver increased nature biodiversity on the site itself.

The site for Blackwood Wind Farm has been specifically selected due to the following reasons:

  • Suitable road access
  • Distance to environmentally designated areas
  • The opportunity to benefit local communities.
  • Reliable and proven wind resource.
  • The existence of operational and consented wind farms in the area.
Site layout

Site layout

Section 36 application

As the total generating capacity of the Blackwood Wind Farm project exceeds 50MW, an application for consent will be made to the Scottish Ministers – via the Scottish Government’s Energy Consents Unit (ECU) – for determination under Section 36 of the Electricity Act 1989.

The proposed development will be subject to a full Environmental Impact Assessment (EIA), the scope of which has been agreed with the Energy Consents Unit (ECU) through the formal EIA scoping process. The EIA is an extensive process which identifies the potential environmental effects of the development and then seeks to avoid, reduce, or offset adverse effects through design or mitigation measures where possible. 

To undertake the EIA, we are carrying out a wide range of technical and environmental studies and surveys. The areas these cover, include:

  • Landscape and visual
  • Archaeology and cultural heritage
  • Ecology
  • Ornithology
  • Geology, hydrology and hydrogeology
  • Traffic and transportation
  • Noise and vibration
  • Aviation, radar and telecommunications

Our application for consent will be supported by a comprehensive EIA report, which will outline the findings of the site studies.

Benefits of
Blackwood Wind Farm

 
 
Tackling the Climate Emergency

The proposal for Blackwood Wind Farm is set against the backdrop of the climate emergency and the vital need to reduce greenhouse gas emissions by transitioning away from polluting fossil fuels to clean, renewable energy sources.

The wind farm development will play its part in tackling this emergency by generating low-carbon renewable electricity, supporting the decarbonisation of the energy sector, and meeting the resulting increase in electricity demand.

This will support the UK Government’s pursuit of a clean power system by 2030, and delivery of the Scottish Government’s ambitious, legally-binding target of net-zero greenhouse gas emissions by 2045. 

Based on current proposals, Blackwood Wind Farm could power the equivalent of around 13,600 Scottish homes with clean, low-carbon electricity annually.

Additionally, it could remove around 18,700 tonnes of carbon dioxide, the major greenhouse gas, annually from the atmosphere (assuming a mixed grid of fossil fuels and renewables). The environmental impact of this is equivalent to removing around 12,700 cars from Britain’s roads.

A series of biodiversity enhancements will also be undertaken to support and enhance natural habitats, amenity spaces, and peatlands.

Tackling climate change

Greater Energy Security and Lowering Energy Bills

International events, such as the war in Ukraine, have focused people’s minds on the risks of overreliance on imported fossil fuels, with the rising cost of gas driving the huge increase in energy bills, a key cause of the cost-of-living crisis.

The growth of secure homegrown renewable energy will help to deliver greater energy security, insulating Scotland and the rest of the UK from future price shocks.

With onshore wind being one of the cheapest sources of new electricity generation in the UK, it has the potential to deliver lower, more stable energy bills for consumers.

Community Benefit Fund

To allow the local community of New Cumnock to share in the benefits of Blackwood Wind Farm, a Community Benefit Fund will be established should the wind farm be consented.

A Memorandum of Understanding has been signed by Blackwood Wind Farm Ltd with New Cumnock Development Trust (NCDT), following negotiations with the New Cumnock Community Council Liaison Group. This comprises the NCDT and New Cumnock Community Council.

While there is no statutory obligation to make such a financial contribution to local communities, Blackwood Wind Farm is firmly committed to working in partnership and delivering a lasting legacy for New Cumnock.

This will comprise a voluntary fund of £5,000 per installed MW of capacity annually for the lifetime of the project, in line with the Scottish Government Good Practice Principles.

Based on the current proposal of around 24MW, this equates to a fund of around £120,000 annually (index-linked), amounting to around £4.8 million over the 40-year lifetime of the project. As it is index-linked, the total figure is expected to be considerably higher.

Some suggestions for how this funding could be used include:

  • Developing social enterprise activities at the former Trotters building.
  • Developing a community-led housing project, building new homes to buy and to let.
  • Developing community-led tourism projects.
  • Improving access to sport, health and wellbeing facilities, as well as preventative health services.
  • Improving travel/transport infrastructure.
  • Supporting access to/provision of good, affordable child care to allow more people to take up job and training opportunities.

If you have ideas for how this fund could be used, please email us at blackwoodwindfarm@qair.energy or call 0131 346 9100.

Signing the MoU. L to R – Colin Davie from Blackwood Wind Farm Ltd; John Hunter, New Cumnock Development Trust; and Willie Nairn, New Cumnock Community Council.

A proposed community benefit fund will support local projects, such as a new playground.

Delivering Local Jobs

Some of the most direct and meaningful benefits that can be delivered by a proposal like Blackwood Wind Farm include jobs and employment opportunities for local businesses and contractors, as well as the use of local services and amenities.

This can generate significant investment in the local area.

Opportunities include:

  • Construction, fencing, drainage and forestry contractors
  • Electrical contractors
  • Materials suppliers, such as building merchants
  • Plant hire and security
  • Waste management and fuel providers
  • Local hospitality providers, such as B&Bs

We are keen to hear from local businesses that may be able to offer skills and services to Blackwood Wind Farm and will work to maximise awareness of the opportunities available in the local supply chain.

If you are a local business and would like to know more, please email us at blackwoodwindfarm@qair.energy or call 0131 346 9100.

When the project is operational, the development’s payment of business rates will help fund local services.

Creating local employment opportunities

Consultation

At Qair, we recognise that a fundamental part of good project development is early, meaningful and effective Pre-Application Consultation (PAC). 

This aims to ensure that the local community and key stakeholders, such as the community council, are given the opportunity to provide feedback on Blackwood Wind Farm and are kept informed of the proposals and development process in advance of the submission of a Section 36 application to the Scottish Ministers.

PAC helps to identify issues and concerns, as well as benefits and opportunities, which we can then consider when developing and refining the project.

As part of this PAC process, two public consultation events were held, with the first taking place in June 2025 and second in December 2025, both at New Cumnock Town Hall. These gave the the public the opportunity to learn more about the project, discuss this with the project team, and provide feedback, helping to further shape Blackwood Wind Farm.

Please note that comments made at this stage are not representations to the Scottish Ministers. If Blackwood Wind Farm Ltd submits an application, there will be an opportunity to make representations to the Scottish Ministers on that application.

A PAC report, accompanying the application, will outline what consultation has been undertaken on the proposed development, and highlight how any feedback received from the local community and key stakeholders was taken account of.

Next Steps

It is currently intended to submit the Section 36 application for Blackwood Wind Farm to the Scottish Ministers in May 2026.

The application will be accompanied by a variety of documents, including the EIA report, a planning statement, design and access statement, socio-economic statement and a PAC report.

Indicative Timeline

Timeline

About Blackwood Wind Farm Ltd

Blackwood Wind Farm Ltd is a subsidiary of renewable energy developer Qair Scotland Ltd, a Scottish-based joint venture between Qair International and EcoProjects Ltd.

Qair is an independent producer of exclusively renewable energy, developing, constructing, and operating wind, solar, hydroelectric, and green hydrogen production projects.

The Qair team has a number of active and early-stage projects in wind, solar, and battery energy storage across Scotland. 

Qair is active in 21 countries across Europe, Latin America, Africa, and Asia. With its 780 employees committed to the energy transition, it aims to become an independent leader in renewable energy, tripling its commissioned assets to 3GW by 2027.

Contact Us

blackwoodwindfarm@qair.energy

Blackwood Wind Farm Limited, c/o Qair Scotland, 1 Johns Place, Leith, Edinburgh, EH6 7EL, United Kingdom

0131 346 9100